Not a chronology of employers

Selected work and impact

The same method at different scales: clarify, measure, verify, and leave the system easier to continue.

30 s → 0.30 smeasured business listing
2 monthsfirst line to production
9 yearscontinuity for internal systems
10M rowspublic reproducible lab
  1. 1998

    The limit becomes a working question

    While building an accounting application at home, I increased the data until the application stopped responding. I found the limit before the first client did.

  2. 2003

    ID-first paging

    I separated the identification of the page rows from loading their complete data. A business list moved from tens of seconds to under one second in a documented historical case.

  3. 2004–2007

    A reusable application engine

    I designed an ASP.NET engine with business objects, explicit actions, XML, XSLT, and integrated paging. The architecture was hosted in SharePoint 2003 and 2007 and used for many business applications.

  4. 2005–2014

    Nine years of continuity for internal systems

    Continuous technical responsibility for an airline company’s internal SharePoint and ASP.NET environment: documents, administrative applications, business web parts, support, and migrations across SharePoint 2003, 2007, and 2010. This was an internal working environment, not the airline’s core operational platform.

  5. 2008–2013

    Platform continuity during rapid growth

    I held primary hands-on technical responsibility for the SharePoint environment used in day-to-day business at Vente Privée: development, administration, deployment, support, patches, training, and production continuity.

  6. 2018–2021

    A platform built to be observed

    On my own time: a multi-site ASP.NET MVC platform with one shared core, ten site projects, and a custom view engine so each site overrides only what it needs. Structured logging, dedicated log tables, and audit tables recording changes and deletions were designed in from the start. Five of those sites are still running publicly today.

  7. 2022–Sep 2026

    Operations, finance and validation

    Primary technical responsibility for an operational and financial platform in construction and infrastructure, including production continuity and validation of calculated data before delivery. The engagement concluded in September 2026; the public description remains anonymized.

  8. 2024–2025

    Public institutional work

    Three online assessment questionnaires for the Romanian Order of Architects: category scoring, generated recommendations, server-side PDF reports produced from the same views as the on-screen result, and Excel export so the institution works with its own data. Live at locuire.oar.archi.

  9. 2026

    The modernisation lab

    A 2011 application rebuilt four times server-side and measured under identical load: three data volumes, first and last page, three paging strategies — 216 requests, one warm-up and three samples per case. Equivalence was verified alongside speed: every implementation returned the same rows. The measurements run on my own synthetic data, never on a client system.

The same method

Clarify. Measure. Verify. Transfer.

Architecture, performance, observability, and continuity are four views of the same responsibility.

Clarifythe operation and result
Measurecost, volume, and limits
Verifyequivalence and behaviour
Transfercode, evidence, and decisions